Get in Touch

SUBMIT

Head Office

Metro Rod

Ashwood Court,

Tytherington Business Park

Macclesfield

Cheshire

SK10 2XF

Have an emergency?

Give us a call

Freephone - 0800 66 88 00

TEXT "DRAINS"

to 60777

Email us

enquiries@metrorod.co.uk

Testimonials

Service you can trust

Metro Rod’s service is trusted by some of the biggest names on the High Street.

We’re proud to solve the drainage problems of major blue chip companies such as Mitie, JD Wetherspoon and BUPA.

They’ve identified that Metro Rod’s unbeatable combination of national standards and local service make us the UK’s leading business-to-business drainage contractor. We’re not just relied upon to provide full emergency drainage cover 24 hours a day, 7 days a week, we’re also well-known for our efforts to make sure we solve every drainage crisis with the minimum of disruption to facilities, staff and customers.

Our customers can guarantee that they’re always our number one priority in any emergency, and we’re also on hand to provide cost-effective drain maintenance services to help keep emergencies at bay. What’s more, all our work is carried out to the highest industry standards of health and safety and customer satisfaction.

In their own words

92
100

Thank you Metro Rod

We've recently carried out a CCTV Survey for Conisbee CSE in London, NW3, in order to ensure planned building works could commence without issue.

All drainage was found to be in good condition, with no remedial works required.

The site manager filled out a feedback form. "Pleased no defects were found, meaning we can begin our building work right away. Thank you Metro Rod for your assistance".

Conisbee CSE

tower block

We were recently called to a tower block in North London which was being affected by flooding. Our team arrived on site within the hour and diagnosed the issue right away, containing the flood and removing the blockage within a stack pipe.

The building manager sent in a feedback form with high praise for our engineers. "Very thankful that your attendance was so quick - preventing major issues at this site".

Rydon Maintenance

Magnificent work

During the summer, we conducted CCTV work at Oakwood Baptist Church in London, N14 which led to authorisation of a large amount of remedial works to the underground drainage system.

The additional work was completed within a week which allowed building works at the church to commence as planned.

The Treasurer of the church emailed with positive feedback, "Magnificent work to the church, we can now get started on the planned building work with delay. Thank you to all of your team for your help".

Oakwood Baptist Church

very Health and Safely conscience

I feel that I need to send you an email commending Kevin Henstock and Steve Georgia who attended the Hanwell Depot on 20th 21st and 22nd January 2016 to carry out a full drainage survey.

 

These two gentlemen were very happy in their work, worked extremely well together and were very Health and Safely conscience when they could have easily cut corners when the site they were working at was unmanned. Every area they were working at was cordoned off with the correct signage on display and it was a pleasure to have them on site and I would gladly accept them back.

Environment Agency

Cheerful in the rain

We called in Metro Rod (Guildford) for a Blockage and they were very efficient and Cheerful in the rain.

Mrs Hill

SUPERB Service!

The Engineer came within minutes of logging the task and sorted out the issue very quickly and efficiently, leaving everything very clean and tidy, SUPERB Service!

Category rating as follows:

Quality of work - 5

Conduct of Engineer - 5

Speed of response - 5

Thank you Metro Rod (Guildford)

Zizzi's Woking

helpful and friendly

We have Metro Rod (Guildford) come to unblock our drains and the engineers were very Polite, helpful and friendly, Great service. Thank you

category rating as follows:

Quality of work - 5

Conduct of Engineer - 5

Speed of response - 5

Value for Money - 5

Corgi Home Plan

very polite

We called out Metro Rod to a blockage and the engineer was very polite and carried out the work very quickly

Mr P Nash
First Wessex Homes

Pages