Building control was very happy!
26th September 2018 - in Bury st Edmonds, Cambridge, Kings Lynn
Metro Rod Cambridge recently carried out a new manhole and soil stack installation for our client Greenleaf Property Services. Our Senior Engineer attended site to carry out a survey and advised accordingly. Graham says "your guy was very knowledgeable and advised me on what could be done, he did this on time and on budget causing the least disruption possible"
To install the manhole, it was necessary to excavate and locate exisiting pipework. We then provided a concrete base, fit a riser and a cover. We ran a new pipe from the new bathroom and connect the soil sack using existing pipework.
Graham Pierce, Director at Greenleaf Property Services confidently said "we were very happy with your service, and more importantly Building Control were also very happy with the end result!" "your Engineer answered all my questions, he left clean and tidy. It was the right job at the right time"