Food Manufacturing plant praise “Professional approach and expertise”
6th March 2018 - in Bath, Bristol, Trowbridge
Our site had been experiencing numerous drainage issues including partially collapsed sewers and vermin, we called Metro Rod Bristol in to investigate. Prior to any works Metro Rod undertook a camera survey to our site which flagged up the areas needing attention.
The works had to be scheduled in when our production line was not working and so Metro Rod Bristol organised the works over the course of the Christmas holidays and 4 weekends in January. The team led by Darren Newport came in to HPWJ to remove all debris from underground pipework some of which was structurally damaged and then repaired the drains using the No Dig option of lining and localised structural repairs. Confined space entry was also used to enter tanks prior to lining. Maximiller cutting equipment was used to eliminate deformaties in the pipework and to cut in lateral branches. Rat blockers were fitted to prevent any vermin entering the drains on site.
The works were carried out very efficiently and with regard to our high demand for hygiene and cleanliness. Metro Rod were thoughtful in using non Styrene resin so that there was no smell from the repair works.
We have been delighted in the professional approach and the expertise with which the work was carried out and the efficiency of the team and would highly recommend Metro Rod to any business experiencing drain issues.